top of page

California’s SB 684 and SB 1123: Can One Lot Become 10 Homes?

Learn how California’s SB 684 and SB 1123 can streamline certain small housing developments, what properties may qualify, and why a proposed project still needs a careful feasibility review.


 California’s SB 684, expanded by SB 1123, created a streamlined approval process for certain small housing developments and subdivisions
 California’s SB 684, expanded by SB 1123, created a streamlined approval process for certain small housing developments and subdivisions

A large residential lot can raise an appealing question: could it support several homes instead of just one? California’s SB 684, expanded by SB 1123, created a streamlined approval process for certain small housing developments and subdivisions. The laws may open new options for infill housing, but eligibility depends on the property and the proposed project.


What the laws do

SB 684 established a process for qualifying projects to receive ministerial review. That generally means the local agency checks the application against applicable legal and objective standards, without discretionary hearings. SB 1123 expanded the process to include certain vacant lots zoned for single-family development. Its expansion took effect July 1, 2025.


For an eligible, complete application, the local agency generally must approve or deny the map application within 60 days. That review timeline does not eliminate the need to meet the law’s requirements or obtain the other approvals needed to build.


Which properties may qualify?

The law covers two broad site categories:

  • Multifamily-zoned lots: Generally, the site must be no larger than five acres and substantially surrounded by qualified urban uses.

  • Vacant single-family-zoned lots: Generally, the site must be no larger than 1.5 acres and substantially surrounded by qualified urban uses. A lot with a permanent structure generally is not considered vacant unless the structure is abandoned and uninhabitable. Additional protections apply to certain rent-restricted, rent-controlled, or recently tenant-occupied housing.


A project must also meet other requirements. These include a limit of 10 or fewer parcels and 10 or fewer residential units, applicable density and local inclusionary housing rules, an average unit size of no more than 1,750 net habitable square feet, and service by a public water system and municipal sewer. Certain sensitive or restricted sites are excluded.


What “streamlined” does—and doesn’t—mean

Ministerial review can reduce discretionary review and hearing steps. It does not mean every large lot can be divided or that a project automatically receives building permits. A proposal still needs to satisfy the eligibility criteria, applicable objective standards, subdivision requirements, and other project-specific rules. HCD’s guidance also emphasizes that projects must fit one of the ownership structures specified in the law.


The law allows some objective local standards to apply, and a local agency may deny a project if it makes the required written finding of a specific, unmitigable adverse impact on public health or safety.


How to read a proposed project

A reported Eagle Rock  proposal to create eight townhomes from one property is an example of the kind of small-scale infill development drawing attention.
A reported Eagle Rock proposal to create eight townhomes from one property is an example of the kind of small-scale infill development drawing attention.

A reported Eagle Rock proposal to create eight townhomes from one property is an example of the kind of small-scale infill development drawing attention. But a proposal is not proof that a particular site qualifies under SB 684 or SB 1123. For a property with an existing home, the first questions include whether the zoning allows multifamily use, whether the site meets the applicable size and location tests, and which approval pathway the application relies on.



Start with feasibility

California’s SB 684 and SB 1123: Can One Lot Become 10 Homes?

Before purchasing or designing around a potential lot split, confirm the zoning, parcel history, site constraints, utility service, subdivision requirements, and the project’s intended ownership structure. A feasibility review can help identify whether the state process may apply and what approvals remain before construction.



 
 
 

Comments


Our Warehouse: 
5401 N Figueroa St, 
Highland Park, CA 90042
​
​
​
Our Office:
21133 Victory Blvd, Suite 225 Canoga Park, CA 91303

 
 CSLB B & C-17 LIC # 1032400
Office Number 323-536-3741

 © 2017 CentrePoint  Construction Inc. 

Business Hours 
Monday - Friday  9:00 am - 7:00 pm
Saturday - Closed
Sunday - Closed 
bottom of page